Key factors for the economical viability and sustainable project management and construction companies
The following document is structured in three sections: firstly, the importance of philosophy, efficiency and growth in the construction company; It is followed by the ten commandments of factors that lead to a viable and sustainable project management and construction companies; and, finally, the importance of improving steadily projects before, during and after his execution.
Avintia is sustained by a strong team, with more than 20 years of experience in the sector, and an innovative project management system, based on our experience, strength and credibility. The birth of the construction company raises the following issues:
Ocean red and ocean blue
The Red Ocean and ocean blue are different strategies to operate in competitive markets and know how good ideas create new demand.
Red Ocean is the description of the high competition, is a space where what is achieved at the expense of others, either by lowering prices and improving quality. Blue Ocean part of the Red Ocean to reach unknown waters to implement new ideas. In the Red Ocean there is rule of the competition; in the Blue Ocean, competition does not exist. The trip to the Blue Ocean part from the Red Ocean and it should take place with imagination. It is not there fighting to keep but enjoys and is rapidly growing. It separated important of the urgent and that the strategy includes improvisation.
The blue ocean does not offer that demand now but somewhat better. The Red Ocean is used ideas and products or areas known, defined and accepted. As it is filled with competitors, the low-gain and the struggle becomes fierce. The Blue Ocean is a Virgin, not explored space and high perspectives of value to those who enter it. It represents that which might be, the unknown. The demand was created in its waters.
There are 10 key factors for the viable and sustainable management of a construction project.
A construction project to be viable, the most important thing for the company is able to count on a team of excellent professionals where combined experience, knowledge and training, as well as an interconnection between all departments of the company knowing take advantage of all possible synergies. To achieve high levels of quality, a client must demand that a construction quality assurance, end-of-schedule and details of each of the phases.
Ten Commandments for addressing each of the projects
1. Rigorous each project studyThis allows us to close a 'Turnkey' price, ensuring the final price for the customer or know the risks they take in a bid to open measurement. It also guarantees the grades covered by the contract with the Builder to be valued at their fair price.
Work and central professionals must possess a very proven experience, both in implementation and compliance with internal procedures. These professionals develop basic and essential skills that are continually reinforced with deployments of new processes, new technologies and new talent.
The central structures must give maximum support to the production lines, not be exclusively control lines.
There must be a guarantee of completion on schedule based on the system of planning through income from work and needs for equipment, making a monthly report of progress, work audits and plans of acceleration tracking.
A planning system should provide very broad character information:
In the estudio-contratación phase, you must provide:
the planning, technical and economic; the commercial impact; security in compliance with the deadlines; a calculation of real deadlines for indirect costs, as well as aggressive deadlines on offer (acceleration plan); contract planning; Budgets not commenced works (Treasury); and a study that takes into account the quantities to 'top tensioners' works not commenced (purchases).
In the implementation phase, the planning system must have:
the launch of the project - review of the process, adjustment of the critical path and resources of the works; a plan of purchasing and Contracting; objectives of the project and dates; an internal system of monitoring and planning of works; budgets and bases of control (Treasury); a correct mensualización to give the reality of the outcome of the work and the company - the system is the basis for projections two years-; monitoring of sub-projects within the work (technical floor); and information to client follow-up and planning of the works.
5. Control and economic betterment of the project
Proper control of the implementation of the cost of the work, provides benefits, such as avoiding construction claims for loss of profit or the end user has a project with the agreed qualities. It also allows the Builder exact knowledge of the reality of the work and the company, ensuring their viability and sustainability. The process of cost control and planning in the company starts from the time of the award of the work until provisional acceptance of the same. From that moment keeps track of the charges and income supplied and pending receive during the implementation of the work.
Audits of quality assurance, implementation and finishes should be in the works to comply strictly with the quality parameters established by the project, the company itself and by current legislation. The objective of these audits is to minimize claims once completed and handed over the work, as well as detect and correct possible defects both project and execution of work units.
On the other hand, during the visit were discussed the problems detected, seek solutions and you will be a report for those involved in the project, with the classification of risks according to their origin (project work site management, promoter), gravity and urgency in the solution.
On the other hand, and each month, the inspector shall draw up a document for follow-up of the dates of visit report, copies and answering. Before delivering the work and after the completion of the work, it will be a final visit of the work to review the implementation of the units of work, where a record and a control sheet should be.
With regard to the management of quality, should be a control according to ISO 9001 and codes and regulations of construction. Thus need a forecast of staff and the necessary infrastructure; control of materials (at the reception, through testing, application for certificate); execution control (program of points of inspection (PPI); measurement equipment control; control of suppliers (bi-annual evaluation in each piece of each participating company); control needs of the client (sending periodic satisfaction surveys).)
7. Environmental management
It is based on the fulfilment of the requirements set by international standard ISO 14001: 2004. Environmental management involves the evaluation of the influence of the project activity on the environment through a comprehensive analysis of the environmental aspects over which it can influence (e.g., generation of waste), suggesting internal objectives of the company to control and reduce those aspects acquired a negative value (for example, reuse of inert waste) or reduction of materials to be used.
All the participating companies must comply with the rules, so be followed closely its implementation through a regular evaluation of suppliers. An analysis of the perception of the customers in environmental terms by sending periodic satisfaction surveys will also be. All this is compounded by actions of environmental awareness through lectures, meetings, awareness-raising, signage, etc., campaigns for the end user: the worker.
8 Security and hygiene
The company will make fortnightly audits of security in work to avoid the risk of accidents during its execution. Internal management must be done according to the requirements of the Osha 18001, assessing the health risks entailed in the implementation of each project: registration and analysis of accidents and incidents; campaigns of awareness/training; regular meetings with the participating companies to anticipate the security measures; etc.
The good performance of the work before receiving guarantees to the developer or client. The objective of this phase is to reach a level of sufficient termination for a degree of satisfaction of buyers or clients in subsequent visits undertaken to work and get on the visit of delivery with a minimum of 90% of incidents resolved. This service must have telephone (902) and technique for 3 years for client and user.
Will be required the hiring of a specific company in the establishment and maintenance of collective protections at work, regardless of the location of the same
For example, through the information service to customers (Sica), in the case of Avintia. It is an information system that offers customers the detailed follow-up of your projects. The reports that are distributed are focused on meeting deadline, the quality control in the performance, safety and environment and are distributed through a web server.
How can we go out of our 'comfort zone'? What tools can have for change? Here are some:
Table of balanced scorecard (CMI)A tool for business that shows is continuously when a company and its employees reach the results defined by the strategic plan.
It is a Department or group that defines and maintains standards of process, generally related to the management of projects within an organization. The PMO works in standardize and save resources through the repetition of aspects in the implementation of different projects. It is also the source of the documentation, management and metrics on the practice of management and the implementation of projects. This Office can operate in areas ranging from providing the functions of support for project management in the form of training, software, standardized policies and procedures, to direct to achieve the objectives of the project leadership and responsibility.
Models of project management office:
-PMO in State 1. Simple Office, with at least two projects. Project managers reported or are a director of program guidelines.This document is based on the presentation Juan Jesús González González, group planning director Avintia, delivered on 6 April in the framework of the fifteenth edition of the international trade fair of machinery for public works, construction and mining, Smopyc 2011.
| SMOPYC - Feria de Zaragoza | Request information | View virtual stand |
![]() | Krona Koblenz Presents his new strategy of mark and the new systems of doors and herrajesEditorial Interempresas
The past 6 June, in a breakfast with the presses that took place in Barcelona, Krona Koblenz gave to know his new strategy of mark and his last novelties of product... [+]
|
![]() | The future of the dried by do of electronsDavid Helsby, president of RadTech Europe
The experiments with do of electrons trace back to 1920 in EE UU, but the first attempts to treat glaze by means of the method of dried by do of electrons did not arrive until the year 1960... [+]
|
![]() | Mele Services Feriales turns into the new representative of Deutsche Messe in SpainEditorial Interempresas
From 1 May 2013, Deutsche Messe AG has transferred his commercial activities in Spain to the company Mele Services Feriales, SL. To communicate to the technical presses this change of representation, the Stadium Santiago Bernabéu received the past 30 May a presses conference to charge of Dr... [+]
|
![]() | Robots to the service of the woodInes Rietzler
The familiar company Voit, situated in Au/Hallertau (Germany), was founded in 1919 by Stefan Voit like carpentry and is specialised in the mechanised wooden to high level for the sector of the piece of furniture and the interiorismo... [+]
|
![]() | Anrepa Celebrates his first National Congress of Recicladores of PalésEditorial Interempresas
The First National Congress of Recicladores of Palés, celebrated the past day 10 May in Madrid and organised by Anrepa, national association that integrates and represents to the companies that devote to the recycled of the palé, has left patent the urgent need to work joined... [+]
|
|