To this end, Aqualia will perform a series of objections before the imminent arrival of the brotherhoods. In this sense, will be to all the abstraction of water wells, because otherwise, there would be enough water for all the pilgrims, still a need to also install generators if they would provide more energy to pump the water.
Other relevant activity will be the withdraw and review engines and pumps of deposits to put them on the verge and verify its correct operation, avoiding the possible impacts on the supply.
On a day-to-day basis, the Municipal water service analyses and contrasts the water through the laboratories of Aqualia and health, which certify its potability and her declared fit for human consumption. However, during religious celebrations need far more solvent controls of water quality, with more than 50 analysis that ensure their consumption.