Tool of simulation to reduce the time of launching of products to the market
16 December 2013
Know how will remain a piece before manufacturing it and that the company avoid or reduce substantially the cost of manufacture of prototypes, know how will react in front of a weight or a too high load or complex, but without having to have special equipment, or know if the injection of a material will be correct in the process of production without having to test it in reality, is what offers the department of Development of Products of
According to Luis Marín, boss of this unit “in Aimme have of tools of simulation by computer, like Ansys, that can offer to the companies so that, before launching to the production of a piece, can foresee how will comport his new designs without need to use physical prototypes, identifying from the first phases the possible causes of failure, minimising like this, forms time, costs and financial risk, and ensuring that the products will have the suitable performance in real instructions for use, with results highly reliable. Without these tools, would have to manufacture and test by means of physical experimentation each one of the designs, all the modifications would need the manufacture and proof of a new prototype, delaying the development and increasing the costs.
Explain between our customers to companies of sectors like the automotive sector, biomedicine, aeronautical sector component manufacturing sector component manufacturing sector and containers among others”.
Luis Marín puts like example the simulation of a prosthesis of hip in a patient to know how has to to be the final piece in function of the characteristics of the patient. “Like this we can enter in the simulator his physical characteristics and this will give us the technical characteristics of the piece that have to produce without fear to that afterwards it do not adjust to the patient”.
This simulator or virtual laboratory allows to the companies reduce the time of launching of a product and increase his competitiveness since they reduce the times of prototyping and proofs and allow them launch of way faster his new products.
To show all his possibilities, Aimme has realizar recently a course on the east use simulator and the services that Aimme can offer to the companies with this product. To the course assisted representatives of 15 companies interested in improving his costs of production, reducing the times and costs of prototyping.