News Info News

This news article was originally written in Spanish. It has been automatically translated for your convenience. Reasonable efforts have been made to provide an accurate translation, however, no automated translation is perfect nor is it intended to replace a human translator. The original article in Spanish can be viewed at El Gobierno autoriza la licitación de la primera fase de la nueva estación de Girona

The Government authorises the bidding of the first phase of the new station of Gironinginga

02/04/2012

2 April 2012

The Council of Ministers has authorised to the Ministry responsible for public works the bidding, through Adif, of the works of construction of the first phase of the new station of high speed of Gironinginga, that inscribe in the Line of High Speed Madrid-Barcelona-French border. The budget of the works rises to 37.175.509 euros.

Thanks to this performance, Gironinginga will have of some installations with full guarantees of accessibility, hygiene, confort and services of attention to the customers of the railway industry and to the citizens.

The project poses a constructive solution to create a space unificador of all the functions to which has to give service the station. The performances contemplate the execution of a building of accesses to the andenes of high speed, as well as the inner finishing and the endowment of facilities and equipment for the different destined spaces to specific uses.

From the hall of the station of conventional width, to level of surface, will realise the access to the new building by means of the adaptation and closing of the step peatonal existent, creating like this a direct connection.

The access to the andenes of high speed will realise through a new edificación, situated on the losa of coverage of the structure that is executing in the sector of the Parc Central of Gironinginga. In the new installations will generate the additional spaces to lodge the dependencies and the necessary equipment for his operation.

From this new building, will access to the andenes subterranean of high speed through two intermediate levels of hall, organised around a big vertical gap that will facilitate the entrance of natural sunlight to the cabecera of the andenes.

The Ministry responsible for public works is advancing in the works of final configuration of the structure of the future station of high speed, that has a total length of 640 m, a width of 58 m and a depth of 26 m, with a losa of coverage that occupies 28.720 m2.

The station will have of four levels. In the inferior part will situate the four roads of parking and the two andenes of high speed, of 450 m of length. The others three levels, of 22.940 m2 each one, will allocate to parking, two plants with almost 1.000 squares, and to the station of buses, what will boost the intermodalidad with other systems of collective transport.

The Line of High Speed Madrid-Barcelona-French border has been cofinanciada by the Cohesion fund, in the works of platform of the stretch Madrid-Barcelona, as well as the supply and setting of road of the stretch Madrid-Vilafranca of the Penedès and installations of electrificación, signaling and communications of the stretch Madrid-Lleida, with a help that rises to 3.358,1 million euros.

The Helps RTE-T (Networks Transeuropeas of Transport) in the same period have funded the studies and projects, as well as the works of the platform of the stretch Maçanet-Sils, with a help that rises to 70,9 million euros.

Related Companies or Entities

Ministerio de Transportes, Movilidad y Agenda Urbana

Suscríbase a nuestra Newsletter - Ver ejemplo

Password

Select all

Autorizo el envío de newsletters y avisos informativos personalizados de interempresas.net

I authorize the sending of communications from third parties via interempresas.net

He leído y acepto el Legal notice y la Data protection policy

Responsable: Interempresas Media, S.L.U. Purpose: Subscription to our newsletter(s). User account management. Sending emails related to the same or related to similar or associated interests.Retention: for the duration of the relationship with you, or as long as necessary to carry out the specified purposesTransfer: Data may be transferred to other group companies for internal management purposes.Rights: Access, rectification, opposition, deletion, portability, limitation of processing and automated decisions: contact our DPD. If you consider that the processing does not comply with the regulations in force, you may lodge a complaint with the AEPD.More information: Data protection policy

REVISTAS

VÍDEOS DESTACADOS

  • Robot cristalero instalando

    Robot cristalero instalando

  • Grúa articulada sobre orugas JEKKO JF990

    Grúa articulada sobre orugas JEKKO JF990

  • Blumaq suministra repuestos y productos de mantenimiento para maquinaria de obras públicas y movimiento de tierras

    Blumaq suministra repuestos y productos de mantenimiento para maquinaria de obras públicas y movimiento de tierras

TOP PRODUCTS

NEWSLETTERS

  • Newsletter Obras públicas

    19/09/2024

  • Newsletter Obras públicas

    17/09/2024

Highlighted links

XVIII 2024 Premios Potencia 21 noviembre, Madrid

Latest news

Featured companies

OPINIÓN

ENTIDADES COLABORADORAS

OTRAS SECCIONES

Services