News Info News

This news article was originally written in Spanish. It has been automatically translated for your convenience. Reasonable efforts have been made to provide an accurate translation, however, no automated translation is perfect nor is it intended to replace a human translator. The original article in Spanish can be viewed at Alco suministra un ascensor para la estación de mantenimiento de la línea 9 del metro de Barcelona

ALCO provides a lift for the maintenance of line 9 of the Barcelona metro station

08/04/2010

April 8, 2010

Alco lift for the maintenance of the Barcelona metro
Alco lift for the maintenance of the Barcelona metro.

Alco, specialist in renting of machinery and auxiliary means, It has become has installed a personal elevator in construction of line 9 of the Barcelona metro. This time the rent of the lift's work is for the maintenance of wagons of the suburban station situated between Olesa and Concepción Arenal of Barcelona streets.

This lift will replace the ladder of service that the concessionary company of the work (Ute Gorg), which has opted for elevation of Alco solutions to expedite access to the bottom of the pit was installed to date. The elevator Goian GE-15, with a cabin of 1,60 x 2 meters, saves a height of 61.5 metres in less than two minutes, offering a capacity of 1,500 kilos, or 18 people.

Suscríbase a nuestra Newsletter - Ver ejemplo

Password

Select all

Autorizo el envío de newsletters y avisos informativos personalizados de interempresas.net

I authorize the sending of communications from third parties via interempresas.net

He leído y acepto el Legal notice y la Data protection policy

Responsable: Interempresas Media, S.L.U. Purpose: Subscription to our newsletter(s). User account management. Sending emails related to the same or related to similar or associated interests.Retention: for the duration of the relationship with you, or as long as necessary to carry out the specified purposesTransfer: Data may be transferred to other group companies for internal management purposes.Rights: Access, rectification, opposition, deletion, portability, limitation of processing and automated decisions: contact our DPD. If you consider that the processing does not comply with the regulations in force, you may lodge a complaint with the AEPD.More information: Data protection policy

REVISTAS

VÍDEOS DESTACADOS

  • Robot cristalero instalando

    Robot cristalero instalando

  • Grúa articulada sobre orugas JEKKO JF990

    Grúa articulada sobre orugas JEKKO JF990

  • Blumaq suministra repuestos y productos de mantenimiento para maquinaria de obras públicas y movimiento de tierras

    Blumaq suministra repuestos y productos de mantenimiento para maquinaria de obras públicas y movimiento de tierras

TOP PRODUCTS

NEWSLETTERS

  • Newsletter Obras públicas

    19/09/2024

  • Newsletter Obras públicas

    17/09/2024

Highlighted links

XVIII 2024 Premios Potencia 21 noviembre, Madrid

Latest news

Featured companies

OPINIÓN

ENTIDADES COLABORADORAS

OTRAS SECCIONES

Services