Promotion will be running line of high-speed Valencia-Madrid at the end of 2010
September 14, 2009
White has toured the 34 kilometres that separate the La Cabrera (in Buñol) tunnel junction south of Valencia, and in whose works of platform development has invested more than 400 million euros. The section on which this journey took place consists of double track of international bandwidth (1,435 mm, 4.7 metres of entrevía on a platform of 14 meters of width) and their geometric characteristics will allow trains to a maximum speed of 350 km/h.