News Info News

This news article was originally written in Spanish. It has been automatically translated for your convenience. Reasonable efforts have been made to provide an accurate translation, however, no automated translation is perfect nor is it intended to replace a human translator. The original article in Spanish can be viewed at José Blanco firma el protocolo para la integración ferroviaria en Ourense

José Blanco signed the Protocol for the railway integration in Ourense

15/04/2011

on April 15, 2011

The Minister of public works, José Blanco, the Mayor of Ourense, Francisco Rodriguez, the President of Adif, Antonio González, and the President of Renfe, Teófilo Serrano, signed the Protocol of collaboration for the railway integration in the municipality. The subject of the Protocol is to establish the general framework, the guidelines and methodology that should regulate reciprocal relations between the Ministry of building, Adif and Renfe and the Ourense City Council for the integration of urban railway in the city and the adaptation of facilities for the incorporation of Ourense to the high-speed network.

The design of these actions will be compatible with the railway access to the line Ourense-Santiago. The solution adopted, presented in February by the Secretary of State for planning and infrastructure, opts for the corridor that freeing the land between Seixalvo and station, improving permeability and ending with the current break the rail infrastructure caused in the territory as wellThere is a layout variant with parameters of high-speed railway that will serve the traffic of passengers and goods, which will run through independent channels, which will enhance the use of the existing route for goods.

The white Minister together with other authorities who have signed the Protocol of collaboration
The white Minister together with other authorities who have signed the Protocol of collaboration.
The selected alternative also includes three ranges of liaison with the line Ourense-Monforte-Lugo, two corresponding to the dual path of international bandwidth and a third for the single track of wide existing bérico. The Iberian wide path shall also maintain access to the stabling of the enterprise city and Taboadela station.

The feasibility study included also a proposal for rationalization of activities and spaces which would largely slimming the space occupied at present, so that we can use leftover space on both sides of the future beach of tracks to integrate the station in the city in an effective manner.

Suscríbase a nuestra Newsletter - Ver ejemplo

Password

Select all

Autorizo el envío de newsletters y avisos informativos personalizados de interempresas.net

I authorize the sending of communications from third parties via interempresas.net

He leído y acepto el Legal notice y la Data protection policy

Responsable: Interempresas Media, S.L.U. Purpose: Subscription to our newsletter(s). User account management. Sending emails related to the same or related to similar or associated interests.Retention: for the duration of the relationship with you, or as long as necessary to carry out the specified purposesTransfer: Data may be transferred to other group companies for internal management purposes.Rights: Access, rectification, opposition, deletion, portability, limitation of processing and automated decisions: contact our DPD. If you consider that the processing does not comply with the regulations in force, you may lodge a complaint with the AEPD.More information: Data protection policy

REVISTAS

TOP PRODUCTS

NEWSLETTERS

  • Newsletter Urbanismo y Medio ambiente

    05/09/2024

  • Newsletter Urbanismo y Medio ambiente

    04/07/2024

Latest news

Featured companies

OPINIÓN

ENTIDADES COLABORADORAS

OTRAS SECCIONES

Services