Centrotécnica - C.T. Servicio, S.A. - Injection moulding machines for universal use (thermoplastic)

Boy

Injection without coladas: with an operative cost schedule very low

Picture of Injection without coladas
Boy, specialised in injection machinery of small tonelaje and high provision; represented in Spain by C.T.Service – Centrotecnica presents the last technology with the new and patented control Procan Alpha.

Characterised by his ease of handle, high speed of management, and wide availability of information, the control Procan Alpha of Boy results to be the most advanced and the one of easier and intuitive handle, what supposes rapidity in the understanding of his manejos, adjust and learning of the operarios, always keeping the high reliability and performance of all the products Boy.

Boy Shows this control in multiple applications, different versions of equipment and programming, standing out the process of memorisation of data, update of parameters in fast changes of mould, sending of data to a CPU centralised and even to mobile telephones.

Another central point of the presentation of Boy, in addition to the control Procan Alpha, is the subject of the economic production. From the beginning, the machines of compact injection Boy characterise by an operative cost schedule very low, factor attributed to the values of consumption of power extremely favourable.

In the year of his anniversary, Boy once again puts special emphasis in the injection without coladas. From the creation of the company, this concept has been of big importance. The injection without coladas deletes the processes extensivos like the deburring of pieces moldeadas, and the trituración and recycling of the coladas. An appearance of the injection without coladas that often ignores or despises is the saving of power. Boy Offers special filters including the injection without coladas in the line flatly of separation of the mould.

By what refers to the saving of power, use technology of hot camera little economic is the second better solution. By norm, the necessary electricity for the hot cameras is only a fraction of which requires to melt and inject coladas.