Perforación Referencias • Lubrecht, M. D. (2012). Horizontal directional drilling: A green and sustainable technology for site remediation. Environmental Science & Technology, Volume 46, No. 5, pp. 2484-2489. • Abdollahipour, S., Jeong, D., Burman, R., and Gunsaulis, F. (2012). Performance Assessment of On-Grade • Horizontal Directional Drilling. Journal of Construction Engineering and Management, Volume 138, No. 3, pp. 458–468. • Allouche, E., Ariaratnam, S., and Lueke, J. (2000). • Horizontal Directional Drilling: Profile of an Emerging Industry. Journal of Construction Engineering and Management, Volume 126, No. 1, pp. 68–76. • Ariaratnam, S. and Beljan, I. (2005). Postconstruction • Evaluation of Horizontal Directional Drilling Installations. Practice Periodical on Structural Design and Construction, Volume 10, No.2, pp. 115-126. • Ariaratnam, S. T., and Allouche, E. N. (2000). Suggested • practices for installations using horizontal directional drilling. Practice Periodical on Structural Design and Construction, Volume 5, No. 4, pp. 142-149. • • Ariaratnam, S. T., and Proszek, J. (2006). Legal con- sequences of damages to underground facilities by horizontal directional drilling. Journal of Professional Issues in Engineering Education and Practice, Volume • 132, No. 4, pp. 342-354. • Baik, H., Abraham, D. M., and Gokhale, S. (2003). A decision support system for horizontal directional dri- lling. Tunnelling and Underground Space Technology, • Volume 18, No. 1, pp. 99-109. • Baumert, M. E., Allouche, E. N., and Moore, I. D. (2004). Experimental investigation of pull loads and borehole • pressures during horizontal directional drilling installa- tions. Canadian Geotechnical Journal, Volume 41, No. 4, pp. 672-685. • • Bayer, H.J. (Editor) (2005). HDD Practice Handbook. Vulkan-Verlag, Essen, Germany • Cheng, E., and Polak, M. A. (2007). Theoretical model for calculating pulling loads for pipes in horizontal di- rectional drilling. Tunnelling and Underground Space • Technology, Volume 22, No. 5-6, pp. 633-643. • Gierczak, M. (2014). The qualitative risk assessment of mini, midi and maxi horizontal directional drilling pro- jects. Tunnelling and Underground Space Technology, • Volume 44, pp. 148-156. • Hair, C.W. (1994). Site Investigations Requirements for Large Diameter HDD Projects. Bton Rouge, Lousiana, New Advances in Trenchless Technology. • IbSTT Asociación Ibérica de Tecnología SIN Zanja (2013). • Manual de Tecnologías Sin Zanja. • Jaganathan, A. P., Shah, J. N., Allouche, E. N., Kieba, M., and Ziolkowski, C. J. (2011). Modeling of an obstacle • detection sensor for horizontal directional drilling (HDD) operations. Automation in Construction, Volume 20, No. 8, pp. 1079-1086. • • Li, S. (2013). Construction monitoring of a municipal gas pipeline during horizontal directional drilling. Journal of Pipeline Systems Engineering and Practice, Volume 4, No. 4, 04013005. • • Liu, T., and Wang, B. (2014). Guidance method in HDD based on rotating magnetic field. IEEE Transactions on Geoscience and Remote Sensing, Volume 52, No. 1, pp. 71-75. • • López-Jimeno, C., López-Jimeno, E., Ramírez, A., and Toledo, J.M. (2000). Manual de sondeos. Tecnología de perforación, Madrid. Lueke, J. S., and Ariaratnam, S. T. (2005). Surface heave mechanisms in horizontal directional drilling. Journal of Construction Engineering and Management, Volume 131, No. 5, pp. 540-547. Lueke, J. S., and Ariaratnam, S. T. (2006). Numerical cha- racterization of surface heave associated with horizontal directional drilling. Tunnelling and Underground Space Technology, Volume 21, No. 1, pp. 106-117. Ma, B., and Najafi, M. (2008). Development and appli- cations of trenchless technology in china. Tunnelling and Underground Space Technology, Volume 23, No. 4, pp. 476-480. Pellicer, E., Yepes, V., Teixeira, J.C., Moura, H.P., and Catalá, J. (2014). Construction Management. Wiley Blackwell, 316 pp. Polak, M.A., and Chu, D. (2005). Pulling loads for polyethylene pipes in horizontal directional drilling: Theoretical modeling and parametric study. Journal of Infrastructure Systems, Volume 11, No. 2, pp. 142-150. Royal, A.C.D., Polak, M.A., Rogers, C.D.F, and Chapman, D.N. (2010). Pull-in force predictions for horizontal di- rectional drilling. Proceedings of the ICE - Geotechnical Engineering, Volume 163, No. 4, pp. 197-208. Slavin, L. (2010). Parametric Dependency and Trends of HDD Pull Loads. Journal of Pipeline Systems Engineering and Practice, Volume 1, No. 2, pp. 69–76. Slavin, L. M., and Najafi, M. (2012). Effect of pipe stiff- ness on maxi-HDD pull loads. Journal of Pipeline Systems Engineering and Practice, Volume 3, No. 1, pp. 22-31. Tighe, S., Knight, M., Papoutsis, D., Rodriguez, V., and Walker, C. (2002). User cost savings in eliminating pavement excavations through employing trenchless technologies. Canadian Journal of Civil Engineering, Volume 29, No. 5, pp. 751–761. Wang, X., and Sterling, R. L. (2007). Stability analysis of a borehole wall during horizontal directional drilling. Tunnelling and Underground Space Technology, Volume 22, No. 5-6, pp. 620-632. Yang, C. J., Zhu, W. D., Zhang, W. H., Zhu, X. H., and Ren, G. X. (2014). Determination of pipe pullback loads in horizontal directional drilling using an advanced computational dynamic model. Journal of engineering mechanics, Volume 140, No. 8, 04014060. Yepes, V. (2014). Maquinaria para sondeos y perforacio- nes. Apuntes de la Universitat Politècnica de València, Ref. 209. Valencia, 89 pp. Yepes, V. (2015). Coste, producción y mantenimiento de maquinaria para construcción. Editorial Universitat Politècnica de València, 155 pp. Zayed, T., and Mahmoud, M. (2013). Data acquisition and factors impacting productivity of horizontal direc- tional drilling (HDD). Tunnelling and Underground Space Technology, Volume 33, pp. 63-72. Zayed, T., and Mahmoud, M. (2014). Neurofuzzy-based productivity prediction model for horizontal directional drilling. Journal of Pipeline Systems Engineering and Practice, Volume 5, No. 3, 04014004. Zhu, X., Dong, L., and Tong, H. (2013). Failure analysis and solution studies on drill pipe thread gluing at the exit side of horizontal directional drilling. Engineering Failure Analysis, Volume 33, pp. 251-264. 60