News Info News

This news article was originally written in Spanish. It has been automatically translated for your convenience. Reasonable efforts have been made to provide an accurate translation, however, no automated translation is perfect nor is it intended to replace a human translator. The original article in Spanish can be viewed at La planta Termosolar Borges instala su turbina de generación eléctrica

The plant Termosolar Borges installs his turbine of electrical generation

23/07/2012

23 July 2012

The plant Termosolar Borges (Them Borges Blanques, Lleida) has received in July the turbine of electrical generation and his auxiliary equipment. The arrival of the game, that has produced between the 9 and on 14 July, is an important milestone in the construction of this plant that is the first installation all over the world that combines power termosolar and biomass.

This fact confirms the forecasts of Abantia and Comsa Emte (companies partners in this project) that the first connection to the electrical network of the plant leridana will produce in the next month of October.

The turbine of electrical generation commissions to transform the steam of water, produced from the heat generated by the solar field and by the boilers of biomass, in electrical power. To make possible the trip of the turbine of steam of high and low pressesure, the electrical generator and the condenser from Germany and Austria by terrestrial and maritime road have been necessary 12 trucks and a self-propelled mobile crane with a capacity of until 400 t.

Installation of the turbine of electrical generation in Termosolar Borges
Installation of the turbine of electrical generation in Termosolar Borges.
Termosolar Borges will be under way the 24 hours to the day. During the hours of sun works the plant termosolar and during the night, the head office of biomass will be the attendant to generate the electricity. A system that allows an elder aprovechamiento of the installation. The plant, with an investment of 153 million euros, will export a power of 22,5 MW, equivalent to the half consumption of more than 27.000 homes. The production of this type of clean power will suppose a saving of 24.500 annual tonnes of carbon dioxide (CO2). The construction began in March of 2011 and in December of 2012 will go in in full operation. At present, the work is generating some 350 places of work, that will turn into the period of exploitation in 30 direct employments and 50 indirect.
Termosolar Guzmán

By his part, the Plant Termosolar Guzmán has completed successfully this month of July his first synchronisation, with what will go in in full operation in August. The Termosolar Guzmán, in Palm of the River (Córdoba), of 50 MW, is another of the projects of reference of Abantia in the thermoelectric sector.

This plant uses the technology of parabolic cylinder for the 96 bows that form the solar field. It explains a surface of more than 340.000 square metres of parabolic mirrors that, of way automated and imitating the movement of the sunflowers, will work, during the hours of sun, orienting from the dawn to the ocaso to reflect the maximum quantity of solar power and head to it a tube manifold fill up of oil that reaches, thanks to said radiation, an upper temperature to the 400 degrees centígrados.

Abantia Forms part of the UTE of construction (EPC) together with FCC and Seridom.

Suscríbase a nuestra Newsletter - Ver ejemplo

Password

Select all

Autorizo el envío de newsletters y avisos informativos personalizados de interempresas.net

I authorize the sending of communications from third parties via interempresas.net

He leído y acepto el Legal notice y la Data protection policy

Responsable: Interempresas Media, S.L.U. Purpose: Subscription to our newsletter(s). User account management. Sending emails related to the same or related to similar or associated interests.Retention: for the duration of the relationship with you, or as long as necessary to carry out the specified purposesTransfer: Data may be transferred to other group companies for internal management purposes.Rights: Access, rectification, opposition, deletion, portability, limitation of processing and automated decisions: contact our DPD. If you consider that the processing does not comply with the regulations in force, you may lodge a complaint with the AEPD.More information: Data protection policy

REVISTAS

VÍDEOS DESTACADOS

  • Robot cristalero instalando

    Robot cristalero instalando

  • Grúa articulada sobre orugas JEKKO JF990

    Grúa articulada sobre orugas JEKKO JF990

  • Blumaq suministra repuestos y productos de mantenimiento para maquinaria de obras públicas y movimiento de tierras

    Blumaq suministra repuestos y productos de mantenimiento para maquinaria de obras públicas y movimiento de tierras

TOP PRODUCTS

NEWSLETTERS

  • Newsletter Obras públicas

    24/09/2024

  • Newsletter Obras públicas

    19/09/2024

Highlighted links

XVIII 2024 Premios Potencia 21 noviembre, Madrid

Latest news

Featured companies

OPINIÓN

ENTIDADES COLABORADORAS

OTRAS SECCIONES

Services