This news article was originally written in Spanish. It has been automatically translated for your convenience. Reasonable efforts have been made to provide an accurate translation, however, no automated translation is perfect nor is it intended to replace a human translator. The original article in Spanish can be viewed at
Sodimate monta una nueva instalación de almacenamientos de fangosSodimate carried out the supply and installation of the new system of transport and storage of sludge from the Etap Lllobregat, owned by ATLL. The facility consists of a system of cargo through flighting, two silos of 150 cubic metres and two extraction systems forced download truck or container. Sodimate provides two new features to the design of this facility which make it different from the rest of the facilities of sludge in his class: loading silo through flighting and release system side forced.
System load, common to two silos, consists of a myriad of collection of sludge, double spiral lift endless and endless dealer. This configuration, simple, great robustness and able to boot in cargo, ensures an easy, reliable and low-maintenance operation.
The download of the silo is carried out with mining forced through flighting, making the loading of the truck with conveyors flighting, without the need to position the truck under the silo. This solution allows to reduce the height total of installation and its visual impact, and also extraction equipment accessible from the ground, making it easy to maintain.